Skip to content

Where results show ​

Open View the proposal report on Accelerate, or Performance → MumBoost in the sidebar. Both open the same Accelerate report. Its title on screen is still MEV Cutoff Optimisation. The subtitle says the window measures either performance since your last cutoff adjustment or a window you selected. The window end date is not included.

Optimum · mump2p · Mainnet above the title names the network. It is not a separate product.

Once the window has proposals, the report shows:

  • Proposal count, in slots.
  • Accepted ETH and unrealised ETH per MEV block. Offsets count from the bid you took, not from the start of the slot.
  • A cutoff curve showing the extra value per MEV block if the cutoff had been later, compared with the bid that was accepted.
  • Head votes and failure types by slot.

No proposals in this window means none of your validators was assigned a block proposal in that range. Widen the window.

No report for this window means the report failed to load. It does not mean you have no proposals. Refresh. If it persists, use Support.

Console stores a configuration only after it confirms you accepted the terms. Could not check the MumBoost terms means that check failed. Wait and refresh. This operator has not accepted the MumBoost terms means you need to accept them on Accelerate first. Both labels use MumBoost, the older name for Accelerate. See Older names on some screens.

The MumBoost entry appears only when it is enabled for your account.